LEOSASA Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Fuchsia)

★★★★★ 4.8 124 reviews

US$6.40
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by almahalsesenteret.no
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$6.40
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Dec 2
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by almahalsesenteret.no
Free 30-day returns Details

Product details

Management number 234679499 Release Date 2026/07/02 List Price US$6.40 Model Number 234679499
Category

Brand: LEOSASA

Color: Fuchsia

Features:

  • 【Adjustable Buckle & Extensible Rope for Multi-Use】 – Size of the Coupler: <2.1-3.1 ft > / <25.6-27.4 in> / <65-95 cm>. Each rope is equipped with an Adjustable Buckle, so you can freely adjust the length when training, walking, running, or hiking with your furry friends. The Retractable Shock-Absorbing leash effectively reduces strain on your arms and shoulders when your dog suddenly lunges or changes direction, ensuring a more comfortable experience for both the dog and the walker.
  • 【360°Swivel Clip for Tangle-Free】 – The Splitter is equipped with a 360° Rotating Buckle, allowing for quick release and locking, preventing twisting or knotting. This ensures your dog’s freedom of movement, giving them more space while aving you time from having to untangle the leash as they move from side to side.
  • 【Traffic Control Handle & Reflective Strap for Safety】 – The Handle near the dog's neck is ergonomically designed with soft, thickened sponge padding for a comfortable grip. The non-slip design ensures a firm hold, providing better control over your dog in any situation. Reflective Threads improve visibility, keeping you and your dog safe during nighttime walks.
  • 【Heavy-Duty Clip & Durable Leash Material】 – The Metal Hook is made from durable and rust-proof galvanized zinc alloy. The leash is crafted from high-strength Climbing-Grade Nylon, ensuring exceptional durability and resistance to chewing and tearing. Reinforced Stitching enhances longevity, making it ideal for daily walks, training, and outdoor adventures.
  • 【Premium Quality & Timely Service】 – At LEOSASA, we are committed to providing premium products that enhance the safety, comfort, and happiness of both you and your dog. If you have any questions, please reach out to us, and we will provide you with a satisfactory solution within 24 hours.

model number: 1V2-Y-FUCHSIA

Part Number: 1V2-Y-FUCHSIA

Package Dimensions: 8.3 x 4.3 x 1.9 inches


Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.8 out of 5
★★★★★
124 ratings | 51 reviews
How item rating is calculated
View all reviews
5 stars
87% (108)
4 stars
2% (2)
3 stars
1% (1)
2 stars
0% (0)
1 star
10% (12)
Sort by

There are currently no written reviews for this product.